Besides,


← BACK

The government has set a target to install 175 GW renewable power capacity by the end of 2022. This includes 60 GW (34%) from wind power, 100 GW (57%) from solar power, 10 GW (6%) from biomass power and 5 GW (3%) from small hydro power.

Ministry of New and Renewable Energy, Government of India

Have something to add? Write to us at info@besides.in.

MORE ↓ LESS ↑